Oil & Gas LibraryOILGASLIBRARY.COM Subscribe
Home / Simulators / Coiled tubing simulator

Coiled tubing simulator

Work from inside the control cab: build the BHA, rig up and pressure-test the stack, then run CT into a deviated well to clean out sand or kick it off with nitrogen, with a live weight indicator, pressures and alarms.

Coiled tubing is a continuous steel pipe spooled on a reel; the injector head pushes it into a live well through the stripper and BOP without killing the well. It is used for sand cleanouts, scale removal, nitrogen kick-offs, stimulation and tool runs.

In this simulator you are the operator in the control cab: you review the well data, build the BHA, rig up and test the stack on the tree, then drive the injector, pump, nitrogen and choke while you read the weight indicator, pressures and alarms. The physics is simplified but consistent: buoyancy and friction in the deviated section, hydrostatic and friction pressures, sand transport and settling, gas expansion and cumulative pipe fatigue.

How to use the simulator

The interactive figure (labels use the English field terms)

Safety note: coiled tubing works on a live, pressured well. Never open the swab before a passed pressure test and equalization, never exceed the approved pull limit of the pipe, and never close blind rams on CT. Stop at once on any stripper leak or pressure reversal. Always follow the approved job program, your company procedures and the supervisor.

What each part does

Simplified teaching model: the well, the pipe (1.75 in × 0.134 in) and every number are illustrative, and time is compressed. Not a job-design tool and no substitute for validated tubing-forces and hydraulics software or certified training.

Sources

  1. NOV CTES: Coiled Tubing Manual (tubing forces, fatigue, hydraulics)
  2. ICoTA – Intervention & Coiled Tubing Association: An Introduction to Coiled Tubing https://www.icota.com/
  3. IWCF Well Intervention Pressure Control (coiled tubing module) https://www.iwcf.org/
  4. API RP 16ST: Coiled Tubing Well Control Equipment Systems https://www.api.org/products-and-services/standards
  5. API RP 5C7: Coiled Tubing Operations in Oil and Gas Well Services https://www.api.org/products-and-services/standards
  6. SLB Energy Glossary: “coiled tubing”, “injector head”, “stripper”, “BOP”, “nitrogen lift” https://glossary.slb.com/
  7. Dawson, R. & Paslay, P. R. (1984). Drillpipe buckling in inclined holes. JPT, SPE-11167
  8. Johancsik, C. A., Friesen, D. B. & Dawson, R. (1984). Torque and drag in directional wells. JPT, SPE-11380
  9. Zuber, N. & Findlay, J. A. (1965). Average volumetric concentration in two-phase flow systems. J. Heat Transfer
  10. Richardson, J. F. & Zaki, W. N. (1954). Sedimentation and fluidisation. Trans. IChemE